House Timeline

Want to know the last big milestone? Check out the dates here!

March 22, 2014 – Signed the paperwork with JR Builders!

April 13, 2014 – Decided on the brick and the stone for the columns.Brick is Cherokee Brookhaven (queensize). The stone is Grey Pro-Fit Ledgestone

IMG_1575

April 16, 2014 – Closed on the construction loan!

April 19, 2014 – Made lots of decisions!

  • Gutters, windows and wood trim – white
  • Roof – black      Black Moire roof
  • Location of outside electrical outlets and water
  • Location of address stone
  • Can lights in the house and outside
  • Cultured marble for the fireplace surround
  • Inside paint colors
  • Elfa pantry design done!

April 23, 2014 – Land-ho! errr…Ground broke!

 